Our Prices Changed.
Not Our Decision.
Here is exactly why.
A government order banning vehicle overloading has changed how construction materials can be transported across Tamil Nadu. The impact on transport cost is direct, significant, and completely outside our control. We are explaining it in full — with exact numbers — so you understand what changed and why.
What the Overloading Ban Actually Means
Long tipper vehicles carrying construction materials like m-sand, aggregates, and granite are now limited to their legally permitted axle load. Previously, vehicles were routinely overloaded — carrying 50 to 55 tonnes in a single trip. Under the new enforcement, the same vehicle can carry only 20 to 25 tonnes per trip. Overloaded vehicles are being stopped at checkposts and heavily fined. Transporters who overload risk losing their permit.
We want to be clear: we are not complaining about this order. Overloaded vehicles damage roads, are dangerous for drivers, and are illegal. Complying with weight limits is the right thing to do. But compliance comes at a cost — and that cost is now being passed on to every customer who buys construction materials in Tamil Nadu, regardless of which supplier they use.
One Vehicle Then. Two Vehicles Now.
Same 50 Tonnes.
This is the entire reason for the price increase. Nothing else changed.
Previously, getting 50 tonnes of raw granite from quarry to our Keerapakkam plant cost us one long-tipper rental. Now, the same 50 tonnes requires two vehicles — two drivers, two trips, two fuel costs, two rental charges. This increase flows directly into the cost of every tonne of sand and aggregate we produce.
every 50t of raw material
per 50 tonnes
pure cost pass-through
In plain words:
Earlier we could load a long tipper lorry with 50 to 55 tonnes of raw material in one shot. This kept our transport cost per tonne very low, and we passed that savings on to you as a factory-direct price. The government has now enforced strict axle load limits — the same vehicle can now legally carry only 20 to 25 tonnes. To move the same 50 tonnes of raw granite from quarry to our Keerapakkam plant, we now need to send two vehicles instead of one. The rental doubles. The fuel doubles. The driver cost doubles. That extra cost is what you are seeing in the revised prices. We have added nothing on top of that.
New Prices — All-Inclusive Delivered
These are confirmed, all-inclusive prices delivered to your site anywhere in South Chennai. No transport charge on top. No documentation charge. GST 5% extra.
The Price Changed. Everything Else Didn't.
The overloading ban affected our raw material transport cost. It did not affect our manufacturing quality, our compliance standards, or our commitment to you.
Still government-issued. Still provided automatically with every load. Still the only document CMDA, DTCP, and RERA accept. Resellers still cannot produce this.
Every tipper still weigh-bridged before departure. You still receive a certified slip. You still pay for exactly what arrives — no short-loading, no guessing.
BIS cert · Sieve analysis · Silt report · Specific gravity · Weigh-bridge slip. Still on WhatsApp automatically before or at delivery. Zero chasing. Zero requests.
Every batch still tested. Silt still below 1.5%. The quality that protects your structure and prevents plaster cracks hasn't changed — only the transport cost to get it to you.
Formal GST invoice still issued for every load. Contractors still claim full input tax credit. No informal receipts. No audit exposure. Every rupee documentable.
7 days a week, 6AM to 8PM. Same-day delivery across South Chennai for orders placed by 5PM. The reliability you've counted on is unchanged.
We are a manufacturer, not a reseller. The overloading ban hit every sand supplier in Tamil Nadu. The difference is what you get for the price you pay. Hardware shops don't give you BIS certificates, weigh-bridge slips, or batch sieve reports. We do — at every price point, new or old.
Same Quality. Same Documents.
Revised Price. Factory Direct.
Call or WhatsApp us to confirm today's rate and same-day availability. We'll give you the confirmed all-inclusive price before anything is dispatched.
7 Days · 6AM–8PM · WhatsApp same number